HARBOR LAB - MANUAL ANSWER KEY
Prepared before submitting prompts. Synthetic scenario; exact prose may vary.

Task 1: 01 only
12 laptops; 2026-11-10 18:00-20:00 UTC (B2).
All 12 must pass sign-in, VPN and test print (B4).
Pause at TWO OR MORE VPN failures (B4), not more than two.
Rollback owner unassigned; no budget amount; rollout date undecided (B5).

Task 2: 01 + 02 only
Compatibility: Leo Martins, 2026-11-06 (B3/M1), completion not evidenced.
Briefing: Nora Patel, 2026-11-09 (B3/M1), completion not evidenced.
Participant list: Maya Chen, 2026-11-05 (M1), completion not evidenced.
Choose rollback owner: Not assigned; Not specified calendar date (M1); before pilot constraint may be stated separately.
20 laptops is a proposal, not approved (M2).
Approved scope remains 12; 2026-11-10 18:00-20:00 UTC (B2/M2).

Task 3: 01 + 02 + 03
10 laptops; 2026-11-12 18:00-20:00 UTC (U1).
U1 explicitly supersedes B2. It rejects the 20-laptop proposal.
All 10 must pass sign-in, VPN and test print (U2).
Pause at two or more VPN failures (U2/B4).
Preparation deadlines unchanged (U3).
Rollback owner, budget amount, company-wide rollout date remain unknown (U4).
A correct answer must not introduce invented costs, owners, approval or completion.

Manual review
Check each fact against the actual text, not the appearance of a citation.
A citation label may be broad: open the file and find the named section.
One correct run is not a guarantee for other runs or unseen documents.
